Skip To Main Content

Phase 2: Auditorium & Gymnasium

Auditorium Upgrades & Improvements

  • Reconstruct rear wall and side wall water damage
  • Replace worn and damaged carpeting
  • Install new wall treatments to improve acoustic quality of the Auditorium
  • Add new light coves above side walls to enhance “house lights”
  • Sound system upgrades and enhancements

BEFORE

Existing auditorium
Existing auditorium
exisiting auditorium
exisiting auditorium

DURING

coming soon placeholder image

AFTER

coming soon placeholder image

 

7-12 Gymnasium Renovation

  • New bleacher seating to allow for spectator attendance at athletic contests and events
  • Renovation of existing gymnasium to include proper athletic lineage and District logo
  • Locker room reconstruction to include team rooms, bathrooms and shower facilities

BEFORE

Existing gymnasium
existing gym
Existing locker room
existing locker room

DURING

A construction site with metal framing, drywall panels, and various construction materials scattered throughout the space.
The image depicts a hallway with rows of blue lockers lining the walls, and a person's backpack and other items on the floor in the foreground.
A large, open industrial space with a wooden truss ceiling, concrete floor, and an orange ladder in the foreground.
A large, open industrial space with concrete walls, a wooden ceiling, and a wet, reflective floor covered in debris.
A large, well-lit indoor basketball court with a polished wooden floor, blue and white lines, and various sports equipment visible in the background.
An empty, unfinished interior space with concrete floors, exposed walls, and a doorway visible in the background.
A cluttered and dilapidated interior space, with debris, rubble, and damaged materials scattered throughout the room.

AFTER

coming soon placeholder image